The V3 Upper can be built in two configurations: Flattop or with an A1 Carry Handle. 

Pages 1-3: Main body of the Upper Receiver. (All colors: Black, Gray, Tan, White)

Page 4: Rails for flattop (M16A3-A4) (All colors)

Page 5: Bolt & Charging Handle (Only comes in Gray or White)

Page 6-7: Fixed Carry Handle for M16A1 (All colors)




All right, time to build.

The core of the upper is the Main Body Shell, which, despite the lack of half-dotted lines, should be folded in such a way so the color is on the inside. The outside will be hidden under other stuff later on. There are two narrow faces at the bottom of the page, which attach to the sides of the Main Body Shell as shown. There's also a little niche which is attached on the left side, also visible here.

Once you've made the Main Body Shell, the first things to attach to it are the Main Base and the Pivot Pin Hook. This is because the sides are going to be attached to these fundamental parts.

Other than that, don't attach anything yet, just get the parts built, because a lot of the important stuff is on pg.2.

The second page has the Rear Ring Border and Takedown Pin Hook, which should be attached to the back in that order.

It also has the left and right walls. Build them, and then attach the rear right wall to get a solid basis for how they fit. It will be necessary to hold it in place so it fits snugly and doesn't stick out beyond the bottom base too much, and you have to make the rear ring border confrom to it, but it shouldn't be much of a problem.

The left wall is harder, because it covers a big area and, because of the gap in it, will have some warping. The side of the main shell that it attaches to will also have some warping, as a result of the big gap and stuff. Therefore, your job is to glue it securely and hold it in place while paying attention and deliberately keeping it straight, to suppress the warping. It will want to go in all sorts of directions, so you have to work closely with it, almost sclupt it, until it dries. Also push in from the inside of the shell to make sure that wall is straight.

Once the left wall is in place you're ready to put in the left side of the base (the boxy protrusion near the magwell, which has the little detail on it) This also has to be carefully held in place until it dries, because it naturally doesn't want to stick to both the front and back parts of the base. You have to make everything stay straight.

Preparing to assemble the right side entails making the ejection port. Unlike the old one, the new ejection port has a rim on top of it. The function of the rim is partly to provide a frame for the cover to fit into like a door frame, and partly to hold the little loops that the axle will fit through. The new axle is not connected to anything, it just fits through a bunch of loops.

The Ejection Port Rim is made of two pieces, one of which is merely a strip that goes along its interior. First, attach this inner strip. Then, you'll have a bunch of tabs and a dangling top face that will eventually swing up and stick to those tabs. However, you first have to glue the two biggest opposing tabs together (overlapped). Then, when folding the top face over, keep in mind that it has to form two little loops. Crease those parts inside-out accordingly so that the loops are more like little circles. After that, gluing it shut is pretty straightforward. Glue it onto the ejection port, in order to give it the necessary bulk to stick to the main shell. The ejection port's opening will be smaller than the rim's. That's ok, it's so the cover has a place to stop.

After the ejection port and the side walls are in place, you can basically proceed in whatever order you want. However, it's preferable to apply the top structure (rails or carry handle) before the Front Face, and the Front Face before the Barrel Well.

The Top Box Walls shown here are inserted inside the main shell, along the top (as indicated by the shape at the end). Their purpose is partially to strengthen the structure and partially to provide guidance for the charging handle so it goes more or less straight.

The Brass Deflector and Forward Assist come in regular and A1 versions. I'm building a flattop here, so I'm making the regular ones.






Let's build the BCG & Charging Handle.

It's pretty straightforward. There's been some adjustment over where the attachment point goes, but if you follow the hatching then it shouldn't be an issue.

The end of the charging handle consists of a piece with a cutout area in the side, this is filled with an "interior," and then has a "latch" that goes inside it. There are lots of little tabs but it's not really all that complicated.





Let's build the A1 Carry Handle.

It comes on two pages. The first page consists of all the core elements. They have white sides, because the sides will be covered up anyway. Except for the top sides, since their inside faces will be visible.

Just glue the core elements together, then go to page 2 and attach the side faces, which will cover up the seams. Since the core elements will differ slightly in their final shape, some effort will be necessary to align the side faces with everything else, but it shouldn't be seriously deformed.

The "Top Face of Lower" is just that: something you attach on top of the lower (in lieu of rails) before sticking the carry handle on there, just to cover up the blank area.